Plans approved to tackle sweltering summers and freezing winters at Sunderland school

A Sunderland primary school plagued by a leaky roof and classrooms which become too hot in summer and are cold in winter is set for major improvement works.

Aim High Academy Trust has won planning permission for repairs at Newbottle Primary Academy, including replacing two classrooms housed within an existing conservatory-style structure.

The conservatory, within the school’s internal courtyard, will be demolished and replaced with a new building providing two classrooms.

Plans also include replacing the covering on the main school roof, which is said to have “numerous leaks and damaged areas” affecting teaching spaces.

Newbottle Primary Academy is set to benefit from a raft of improvements, not least a new roof.placeholder image
Newbottle Primary Academy is set to benefit from a raft of improvements, not least a new roof.

An accompanying design and access statement said the works aimed to “provide teaching spaces that are not subject to extreme weather conditions (hot in summer and cold in winter) and a watertight safe teaching environment”.

It added that the school’s roof has “numerous leaks and damaged areas of covering that are creating an expensive maintenance issue”, as well as impacting teaching environments.

The proposed replacement classrooms aim to “meet the needs of the school and provide suitable and compliant space”.

Sunderland City Council’s planning department approved the repair plans on September 30.

Officers said the proposal represented a “positive improvement to the existing building and its use as an education facility” and noted the proposed design and materials were acceptable.

They added that the proposal would not impact car parking provision or the highway network and raised no pedestrian safety concerns.

The council report states: “It is considered to be an acceptable form of development which would not cause unacceptable harm to the amenities of the occupiers of the education facility or any neighbouring properties, or the street scene in general, nor would it negatively impact highway safety.”

The replacement classroom building would be traditionally constructed with a flat roof and roof lights, while retaining the same footprint as the existing conservatory.

The proposed re-roofing of the main school building would see the existing slate replaced with a “cement-based slate-look-a-like effect”, alongside new fascias, soffits and rainwater goods.

For more information on the plans and the local authority’s decision, visit the council’s planning portal and search for reference 26/01512/FUL.

News you can trust since 1873
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice